• Latest
  • Trending
  • All
Aerial view of a freight train on railway tracks.

Lobito Corridor Explained: The Railway Carrying Central Africa’s Copper to the Atlantic

November 23, 2026
Tropical beach with palm trees and granite rocks in Seychelles under a blue sky.

Seychelles Election 2025: Patrick Herminie’s 52.7% Win and What Comes Next

November 23, 2026
Women checking voter lists on election day.

Africa’s Women Presidents: The Six Who Have Led — and Who Could Be Next

November 23, 2026
Aerial view of the harbour in Dar es Salaam, Tanzania.

Tanzania Election 2025: Samia Suluhu Hassan’s 97.66% Win and What Comes Next

November 23, 2026
Marathon runners on the street in Berlin, with the Brandenburg Gate behind them.

Why East African Runners Dominate World Marathons

November 22, 2026
Aerial view of the Monument of Reunification in Yaoundé, Cameroon.

Cameroon Election 2025: Biya’s Eighth Term Explained

November 22, 2026
Contemporary cityscape of Abidjan featuring high-rise buildings by the waterfront under overcast skies.

Côte d’Ivoire Election 2025: Ouattara’s Fourth Term Explained

November 22, 2026
An INEC official in a blue vest holding a tablet at a polling station, with 'Polling Station' and 'Voting in Progress' posters.

Nigeria Election 2027: Dates, Candidates and What Decides It

November 21, 2026
A large bucket wheel excavator operating in a terraced open-pit mine.

Africa’s Lithium Boom Explained: Who Mines It, Who Profits, What’s Next

November 21, 2026
Wind turbines and solar panels in a desert with mountains behind.

Africa’s Green Hydrogen Race: Big Promises, Slow Reality

November 21, 2026
A large concrete hydroelectric dam with a powerhouse and turquoise water in a mountain landscape.

GERD Explained: Ethiopia’s Nile Dam, the Dispute, and What Happens Next

November 20, 2026
An offshore oil platform with a drilling derrick and a red supply vessel in calm blue sea under a blue sky.

Senegal Oil and Gas Explained: Sangomar, GTA and the Money Question

November 20, 2026
A satellite orbiting Earth above North Africa and the Mediterranean Sea.

Africa’s Space Programmes Explained: 69 Satellites, One Agency, and What’s Next

November 20, 2026
Afrikeye
  • Afrikeye | Africa News Today
  • Business & Investment
    • Jobs
    • Microfinance
  • Politics
    • African Elections
    • Zambian Elections
  • Opinion
  • Technology
    • AI
  • Sports
    • FIFA World Cup
  • Health
  • Travel
No Result
View All Result
  • Login
  • Register
  • Afrikeye | Africa News Today
  • Business & Investment
    • Jobs
    • Microfinance
  • Politics
    • African Elections
    • Zambian Elections
  • Opinion
  • Technology
    • AI
  • Sports
    • FIFA World Cup
  • Health
  • Travel
No Result
View All Result
Afrikeye
No Result
View All Result
Aerial view of a freight train on railway tracks.

Lobito Corridor Explained: The Railway Carrying Central Africa’s Copper to the Atlantic

Andrew Crew by Andrew Crew
23/11/2026
in Business
Reading Time: 4 mins read
240 12
0
491
SHARES
1.4k
VIEWS

Copper from the Congolese Copperbelt used to travel by truck for weeks to reach a port. Now it travels by rail to the Atlantic in about seven days. The route is the Lobito Corridor: a railway from the port of Lobito on Angola’s Atlantic coast to the copper and cobalt mines of the Democratic Republic of Congo and Zambia. It is running today, it is carrying copper — and it is also one of the most openly geopolitical infrastructure projects in Africa, backed by the United States and the European Union as an alternative to Chinese-controlled routes.

The corridor’s central axis is the Benguela railway, about 1,300 km from Lobito to Luau on the Angola–DRC border. The line is more than a century old and was largely destroyed during Angola’s civil war. It was rebuilt from 2006 under an agreement with China financed by a $2 billion Beijing loan — then fell into poor repair. In 2022 Angola handed the line to a new operator, Lobito Atlantic Railway — a consortium of Portugal’s Mota-Engil, commodities trader Trafigura and Belgian rail operator Vecturis — under a 30-year concession. The consortium has run it since 2024.

The route, in three parts

1. Angola — running. The Benguela line from Lobito to the DRC border is operating. In 2025, its first full year, it moved more than 200,000 tonnes of cargo, and the first copper shipped from the DRC through Lobito reached the United States in August 2024. The operator’s target for 2026 is 240,000 tonnes of copper from Kolwezi to Lobito.

2. DR Congo — being rebuilt. In August 2026 Mota-Engil signed a 30-year concession with the DRC government for the 1,037 km section from Dilolo on the Angolan border to Sakania near the Zambian border, investing about $1.8 billion to upgrade it. The upgraded line is expected to carry up to 13.7 million tonnes of freight a year.

3. Zambia — still to be built. The missing piece is a new railway of 515 km in Zambia and 315 km in the DRC, running from Luacano through Zambia’s North-Western and Copperbelt provinces to Chingola. The Africa Finance Corporation (AFC) is the lead developer, and it is talking to at least 10 African and foreign financiers to raise $3–5 billion for the project, aiming for financial close in the fourth quarter of 2027 and completion by 2030.

Who pays

The Angola line’s upgrade is already funded: a $553 million loan from the US International Development Finance Corporation plus $200 million from the Development Bank of Southern Africa — a $753 million package signed in December 2025 that reached financial close in July 2026. The money rebuilds bridges, stations and signalling, restores the mineral terminal at Lobito port, and is meant to lift the line’s capacity from 0.4 million tonnes a year to 4.6 million, while cutting transport costs by up to 30%.

The Zambia spur is a bigger ask. Alongside the AFC, backers include the African Development Bank and the Italian government, and Zambia’s Industrial Development Corporation and Angola’s sovereign wealth fund are each expected to take 10% equity. One reason lenders are listening: the US mining firm KoBold Metals has already signed on as an anchor customer, committing to move at least 300,000 tonnes of copper a year from its Mingomba deposit in Zambia.

What it carries — and the gap

The prize is the Copperbelt’s minerals. The DRC is the world’s second-largest copper producer and its largest cobalt producer, with about 70% of global cobalt output. Minerals make up 90% of the DRC’s exports. Today the corridor’s volumes are small against its ambition: the 240,000-tonne target for 2026 is about 5% of the line’s 4.6-million-tonne design capacity — Afrikeye’s calculation. The seven-day transit from Kolwezi to the port, against 40–55 days by road to ports in the east or south, is the corridor’s whole commercial argument. Whether it fills up depends on the Zambia spur being built, and on mines choosing Lobito over the routes they already use.

Why it matters

For Zambia and the DRC, Lobito is a second door to the sea — and a shorter one. For Angola, it is transit income, more than 1,000 new railway jobs, and over $350 million of local procurement in the first five years. For Washington and Brussels, it is a supply chain that China does not control: Chinese firms own or operate much of the DRC’s mineral production, and Beijing is spending $1.4 billion reviving the rival Tanzania–Zambia railway to Dar es Salaam. The corridor is not finished, and the Zambia leg may yet slip past 2030. But the Angola line is running, the DRC leg is contracted, and the money for the rest is being raised now. The next date to watch is the financing close, targeted for late 2027. More on the region’s mining economy is in our Business coverage.

Frequently asked questions

What is the Lobito Corridor?
A railway and logistics route from the Atlantic port of Lobito in Angola to the copper and cobalt mines of the DRC and Zambia, built around the 1,300 km Benguela railway.

Is the Lobito Corridor already running?
Yes, in part. The Angola section has operated since 2024 and moved more than 200,000 tonnes in 2025. The DRC section is being upgraded, and the new Zambia link is still being financed.

Who funds it?
The Angola upgrade is funded by a $553 million US DFC loan and $200 million from the Development Bank of Southern Africa. The Zambia spur needs $3–5 billion, led by the Africa Finance Corporation.

Why does it matter?
It cuts the journey from the Copperbelt to a port to about seven days, against 40–55 days by road to eastern or southern ports, and gives Western buyers a route to Congolese copper and cobalt that China does not control.

facebookShare on Facebook
FollowFollow us
Tags: Africa Finance CorporationAngolaBenguela Railwaycobaltcoppercritical mineralsDRCLobito Atlantic RailwayLobito CorridorZambia
Previous Post

Africa’s Women Presidents: The Six Who Have Led — and Who Could Be Next

Next Post

Seychelles Election 2025: Patrick Herminie’s 52.7% Win and What Comes Next

Andrew Crew

Andrew Crew

Andrew Crew is a news reporter at Afrikeye covering West Africa and Zimbabwe. With nine years of reporting experience, he writes on politics, business and current affairs across the region.

RelatedPosts

A large bucket wheel excavator operating in a terraced open-pit mine.

Africa’s Lithium Boom Explained: Who Mines It, Who Profits, What’s Next

November 21, 2026
0

In 2018, Africa produced about 2% of the world's lithium. In 2025, Zimbabwe alone mined an estimated 28,000 tonnes —...

Wind turbines and solar panels in a desert with mountains behind.

Africa’s Green Hydrogen Race: Big Promises, Slow Reality

November 21, 2026
0

Africa has announced 78 green hydrogen projects worth $194 billion, with about 38 gigawatts of planned electrolyser capacity. It has...

An offshore oil platform with a drilling derrick and a red supply vessel in calm blue sea under a blue sky.

Senegal Oil and Gas Explained: Sangomar, GTA and the Money Question

November 20, 2026
0

In June 2024 Senegal produced its first barrel of oil. Ten months later it was exporting oil and LNG at...

Oil refinery distillation towers, pipes and storage tanks under a clear blue sky.

Dangote Refinery Explained: How Nigeria Became a Fuel Exporter

November 20, 2026
0

In September 2026 the Dangote refinery produced 47.22 million litres of petrol a day — more than Nigeria consumes —...

Next Post
Tropical beach with palm trees and granite rocks in Seychelles under a blue sky.

Seychelles Election 2025: Patrick Herminie's 52.7% Win and What Comes Next

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recent Posts

  • Seychelles Election 2025: Patrick Herminie’s 52.7% Win and What Comes Next
  • Lobito Corridor Explained: The Railway Carrying Central Africa’s Copper to the Atlantic
  • Africa’s Women Presidents: The Six Who Have Led — and Who Could Be Next
  • Tanzania Election 2025: Samia Suluhu Hassan’s 97.66% Win and What Comes Next
  • Why East African Runners Dominate World Marathons

Recent Comments

No comments to show.
Afrikeye home

Not just the news — We bring the meaning behind it. Cutting through the noise with depth, clarity, and perspective that others miss.

About Afrikeye · Editorial Standards · Corrections Policy · Contact · Privacy Policy

Facebook Instagram X-twitter Linkedin

Welcome Back!

Login to your account below

Forgotten Password? Sign Up

Create New Account!

Fill the forms below to register

All fields are required. Log In

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Afrikeye | Africa News Today
  • Business & Investment
    • Jobs
    • Microfinance
  • Politics
    • African Elections
    • Zambian Elections
  • Opinion
  • Technology
    • AI
  • Sports
    • FIFA World Cup
  • Health
  • Travel

Copyright © 2026 Afrikeye.

Go to mobile version